Loudon County Commission · District 2, Seat A
The Noise Resolution
What it would do, where it would apply, how it would be enforced, and the questions that remain open before anyone votes on it.
Posted November 2026 · Reference for the Commission workshop on Monday, November 16
Why this page exists
A resident came to me because noise at their property had become unlivable and they could not get relief. Loudon County has no noise ordinance. There was nothing for a deputy to enforce, so there was nothing anyone could do.
County Attorney Bob Bowman has prepared a draft resolution that would change that. It has not yet been before the Commission and has not been publicly discussed, which is why I am writing this now rather than after the fact. It is headed to the Chairman for placement on the November 16 workshop agenda. A workshop is where an item gets talked through before it becomes a vote, which is the right place for something that would apply countywide.
This page is the reference for that discussion. It sets out what the draft says, what it cannot reach, how it would be enforced, and which questions remain open. Publishing the unresolved items alongside the settled ones gives anyone following along the same picture the Commission will be working from.
What the resolution actually is
It does two jobs in one document, and that is worth understanding before anything else.
First, it picks up a power the county does not currently have
Tennessee counties are not cities. A county only has the authority the state hands it. State law lets a county adopt, for itself, certain police powers that are normally held by municipalities. Those powers include the authority to define and regulate things that are detrimental to the health, comfort, safety and welfare of residents. Loudon County, as best I can determine, never adopted that authority. Section 1 of this resolution adopts it.
Second, it sets the noise standards
The decibel limits, the list of prohibited acts, the exceptions, the permits and the penalty are all regulations enacted under the authority that Section 1 picks up.
Both halves require a two-thirds vote of the entire Commission
Not two-thirds of those present, and not a simple majority. State law requires a two-thirds vote to adopt the powers and a two-thirds vote to enact regulations under them, and this resolution carries both in one instrument. How the Commission takes that vote is a procedural question I have asked the County Attorney about, and it is the first item on my list below. It is worth flagging early because two-thirds of the full body is a higher bar than most items we handle, and anyone counting votes should know that going in.
What it covers, and what it cannot touch
The second half of this is the part most people will care about, and it is the part least likely to come up on its own. The limits are set by state law, not by anything the Commission chose.
What it would reach
- Sound measured at the property line: 65 dB(A) daytime and 60 dB(A) overnight from a residential use; 80 and 75 from a commercial use; 80 from industrial
- Amplified sound from radios, instruments and loudspeakers between 10:00 p.m. and 6:59 a.m.
- Barking, howling and other long-continued animal noise
- Vehicles out of repair, noisy loads, exhausts without an effective muffler
- Horns and signaling devices used as something other than a warning
- Car audio audible more than fifty feet from the vehicle, bass included
- Yelling, shouting and whistling that disturbs a neighborhood
- Sound trucks, steam whistles, pneumatic devices, attention-getting drums
What it cannot reach
- Anything inside a city. This authority reaches only the unincorporated county. Lenoir City, Loudon, Greenback and Philadelphia set their own rules inside their limits
- Normal agricultural activities. State law expressly withholds this power from counties
- Surface mining, oil and gas production, and the activities covered by the state alcohol, environmental and water statutes, all carved out by the same law that grants the authority
- Very likely a data center, for three separate reasons set out below
- Construction and road work during permitted hours, emergency and utility work, organized sporting events, refuse collection, aircraft
- Lawn mowers, leaf blowers and similar equipment between 8:00 a.m. and 9:00 p.m.
- Children twelve and under at play
- Religious and political gatherings protected by the First Amendment
There are sixteen exceptions in all, and three limits are worth having straight before a vote. This resolution does nothing inside a city. It does nothing about a farm. And on my reading it very likely does nothing about a data center. If those are the calls you expect it to answer, it will not answer them, and the third one deserves its own explanation.
Data centers are the gap I would want closed
The county already has noise from these facilities on the record as a concern. When the Commission adopted a six-month moratorium on data centers in June, the resolution cited noise among its reasons, and residents raised it during the public hearing, including its effect on livestock. A public hearing on extending that moratorium is scheduled for December 7. Given that history, it is fair to ask whether this noise resolution would reach a data center built in the unincorporated county. Reading the draft against that question turns up three problems, and they compound.
The first is that the definitions do not clearly place a data center in either category. Industrial use is defined as a premises where manufacturing, processing or fabrication of goods or products takes place, and commercial use as offices, clinics, kennels, shopping and service establishments. Those are the conventional categories, and they predate the question. A data center processes data rather than goods, and it is not a shop or a clinic. It fits neither definition cleanly, which leaves the applicable limit open to argument before anyone takes a reading at all. That ambiguity matters less than what happens once a reading is actually taken.
The second problem is the measurement itself. Every standard in the resolution is A-weighted, written as dB(A), and A-weighting deliberately discounts low-frequency sound because human hearing is less sensitive to it. The noise that generates data center complaints is predominantly low-frequency, the continuous hum of cooling plant and fans, which is exactly the range A-weighting discounts. A facility producing a hum that genuinely disturbs a neighborhood can return an A-weighted reading comfortably inside an 80 or even a 65 dB(A) limit. Communities that have dealt with this have had to add low-frequency or C-weighted standards, or a penalty for tonal noise, and as far as I can tell neither approach is in this version. There is also a provision that may make the measurement question moot.
The third problem sits in an exception already on the list. The resolution exempts air conditioning and refrigeration units appurtenant to a permanent structure, so long as the unit is not so out of repair as to create grating, grinding or rattling noise. That is standard language. It appears in noise ordinances all over the country, it was written long before anyone was siting data centers next to neighborhoods, and it is plainly aimed at a residential heat pump. The difficulty is that a data center's cooling plant is, read literally, air conditioning appurtenant to a permanent structure, and a well-maintained chiller array is not out of repair, so on the face of the text the exception appears to apply however loud the installation runs. Intent is not what gets enforced, which is why this one is worth putting in front of the County Attorney rather than leaving in a footnote.
None of this is an argument against the resolution. It is an argument for deciding deliberately whether data centers belong inside this instrument or inside the zoning standards the Planning and Codes Director was directed to prepare under the moratorium. Either answer is defensible. Passing this without choosing one leaves the county with a noise ordinance that residents could reasonably assume covers the facility they were most concerned about.
How it would be enforced
This is the part I think deserves the most attention Monday, because it is the part that determines whether the resolution solves the problem that started it.
It is a civil matter, not a criminal one
A violation of a regulation adopted under this authority is not a crime. No state statute makes it one. The Tennessee Attorney General has addressed this directly: because no statute names an enforcing officer, the action would be brought on behalf of the county by the county attorney, and it is a civil action. General Sessions Court has jurisdiction to hear it and to impose the fine.
That matters because the complaint that started this was one the Sheriff's Office could not act on, and a civil process does not change that. Someone has to take the complaint, someone has to document the violation, and someone has to file. Those are administrative arrangements the county makes rather than things a resolution normally spells out, which is why they need settling separately. I want them answered before we vote, along with what it costs the general fund to run the process ten or twenty times a year.
The fine is fifty dollars, and that figure is set by the state constitution
The penalty in the draft is capped at fifty dollars per violation, which is a constitutional limit rather than a drafting choice. Article VI, Section 14 of the Tennessee Constitution prohibits a fine above fifty dollars unless a jury assesses it, a provision carried forward from 1796 and still in force. The Commission therefore has no authority to set a higher figure, and a motion to raise it would create a problem rather than solve one. The draft addresses the deterrence question a different way.
That mechanism is the continuing-violation clause. Every half hour a violation continues, or recurs within a half hour, counts as a separate offense. The practical effect is that a noise running across an evening is not a fifty-dollar matter, so the cap constrains the unit rather than the total. How any of this reaches a courtroom depends on the measurement question below.
The county does not own a sound level meter
Part of the resolution depends on equipment the county does not currently have. The decibel standards in Section 5 call for a calibrated meter, a reading taken five feet above grade on a slow response setting, and an operator trained to take it, and Loudon County has none of those today. That gap does not affect the whole resolution, but it does determine which portions could be enforced the day it passes.
The provisions that do not require an instrument are the larger share of the document. The general prohibition, the amplified-sound provision, the animal provision, the yelling provision and the fifty-foot car audio standard are all judged by an ordinary listener against the ten factors the resolution lists. The decibel table, by contrast, would remain unenforceable until a meter is purchased and someone is trained on it. The Commission can reasonably adopt the resolution either way, provided it does so knowing which half operates immediately and which half waits on a budget decision.
Questions and answers
The questions I expect, answered as straight as I can answer them.
Does this apply to my property?
Only if you are in the unincorporated county. If your address is inside Lenoir City, Loudon, Greenback or Philadelphia, this resolution does not reach you, and your city's own rules govern.
Does this let the county regulate a farm?
No. State law says this authority cannot be used to prohibit or regulate normal agricultural activities. That is not a policy choice the Commission is making; it is a limit written into the statute that grants the power.
What about a quarry or a rock crusher?
Largely out of reach. Surface mining is one of the categories the statute carves out. Some adjacent activity may still be covered, but anyone expecting this to answer a quarry complaint should not count on it.
Can I still run a mower, use a chainsaw, or have a party?
Yes. Domestic power equipment is exempt between 8:00 a.m. and 9:00 p.m. For an event, there is a special noise permit: Friday, Saturday or a federal holiday, 7:00 a.m. to 10:00 p.m., one day at a time, no more than two per property per year, applied for at least three business days ahead. The permit buys you 10 dB(A) above the standard, not unlimited noise.
Will I get a warning first?
The draft says no warning is required. I would like the Commission to talk about that Monday. The resolution as written also takes effect immediately on passage, with no publication period and no grace window. I am not opposed to enforcing it, but enforcing a brand-new rule against someone who had no way to know it existed is a different thing from enforcing it against someone who has been told twice.
Church bells, school ball games, the fire siren?
All exempt. So are emergency vehicle warning devices, utility crews restoring service, and night road work. Security alarms are exempt as well, provided they shut themselves off within five minutes for a continuous sound or fifteen for an intermittent one.
Would this cover a data center?
Probably not, and that is a problem worth fixing before a vote rather than after one. The draft does not clearly place a data center in either the commercial or the industrial category, its decibel standards are A-weighted and therefore discount the low-frequency hum these facilities actually produce, and the existing exception for air conditioning equipment may cover a cooling plant outright. The county's data center moratorium is a separate matter with its own public hearing on December 7, and the zoning standards being prepared under it may be the better place to handle this. What I do not want is for residents to assume the noise resolution has it covered when it may not.
Is this aimed at anyone in particular?
No. It started with one resident's complaint, and I am not going to name them. That is their business, not the county's. The resolution is written as a general standard and applies to everyone in the unincorporated county equally, including me.
Does this cost the county money?
Yes, and nobody has put a number on it yet. A sound level meter and training. Staff time to take and document complaints. County Attorney time to file civil actions. Possibly a permit desk. I would rather raise that now than discover it in next year's budget.
What I am asking the Commission to resolve
The items below are the ones I believe should be settled before a vote. None of them is an argument against the resolution itself, and several have straightforward answers that simply have not been given yet. Taken together they are the reason to work through this at a workshop rather than take it up cold.
One vote or two? The statute describes two two-thirds votes, one to adopt the powers and one to enact regulations under them, and this resolution carries both in a single instrument. I would like the County Attorney's read on whether one vote satisfies that, and if there is any doubt, taking two roll-call votes at the same meeting settles it at no cost to anyone.
Whether to state the jurisdictional limit on the face of the document. Section 2 incorporates the limits in the state statute, which is the ordinary way to draft this and is legally sufficient on its own. The separate question is whether the Commission also wants the text to say in plain words that the resolution reaches only the unincorporated county. Practice varies among Tennessee counties. My own preference is to include the sentence, because this is the question residents will ask most often and a document that answers it without a cross-reference saves everyone the lookup. That is a choice about public clarity rather than a change to what the resolution does.
Who initiates enforcement, and what does it cost? The intake, the documentation, the decision to file, and the budget line behind all of it.
The meter. Giving the decibel standards practical effect requires funding an instrument, specifying its class and calibration interval, and identifying a trained operator. Until those three things exist, Section 5 cannot be enforced.
Administering the permits. The resolution creates two permit functions, special noise permits for events and permission for construction outside normal hours, both sitting with the county's building official. The questions that follow are administrative rather than legal. Which office handles them day to day, and does it have the capacity to take that on? Does the Commission want a fee attached, and a route to appeal a denial? Those are decisions for this body to make rather than something the County Attorney can settle for us. The text uses "building official" in one place and "building inspector" in another, which I read as the same office, and confirming that would make the final version consistent.
What does the repealer displace? The draft repeals all prior county resolutions, regulations and policies inconsistent with it. We should know what, if anything, that actually affects before we adopt it.
Are existing noise sources grandfathered? Nonconforming-use rules may allow an existing operation to continue even if it would violate the new standards. Worth a clear answer rather than a surprise.
Effective date. Immediately on passage, as drafted. The Commission should decide deliberately whether that is right or whether a notice period makes more sense.
Data centers. Three questions for the County Attorney, and they stand or fall together. Does a data center fall under the commercial or the industrial standard, or neither as the definitions are currently written? Should the resolution add a low-frequency or tonal standard, given that A-weighting discounts the frequencies these facilities produce? And does the air conditioning exception, read literally, exempt a data center cooling plant? If the answer is that this belongs in the zoning work instead, that is a fine answer, but it should be a decision rather than an oversight.
Monday, November 16
If this affects you, come say so
The Commission workshop is the place where this gets discussed before it becomes a vote. There is a sign-up sheet on the podium for public comment, and you do not need to be an expert or have anything prepared.
If noise where you live has been a problem and you have had nowhere to take it, I would like the Commission to hear that. If you run a business, a farm, a shop or a venue and this worries you, I would like them to hear that too, and I would rather hear it Monday than after we have passed something.
If you cannot make it, write to me and I will make sure your comment is in front of the Commission.
Check it yourself
Everything on this page comes from the draft resolution and from public sources. The draft is a public document and I will make it available to anyone who asks.
- T.C.A. § 5-1-118: the statute that lets a county adopt these municipal powers, including the two-thirds vote requirement, the unincorporated-areas limit, the agricultural exclusion and the list of carved-out activities
- T.C.A. § 6-2-201(22): the municipal police power being adopted
- Tennessee Constitution, Article VI, Section 14: the fifty-dollar limit on a fine not assessed by a jury
- Tennessee Attorney General Opinion 03-024: enforcement of county regulations adopted under § 5-1-118(c)
- UT County Technical Assistance Service: guidance and model resolution for counties adopting these powers
If I have any of this wrong, tell me and I will correct it. That is easier to do now than after a vote.